03-13 2024 | By:
HuaNan City No. 5 Trading Plaza Project.
Project completion time: one week
Project introduction:The building area is 160, 000 square meters, with the transformer installed capacity of 2×2, 000kVA+2×2, 500kVA+1×1, 250kVA, and the high-voltage motor load of 2, 206kW.
Products offered:The rectifier phase-shifting transformer
Copyright © 2022 ZTelec Group. All rights reserved.