Urban Village Reconstruction Project, located in the city center, the project covers a total area of 260. 03 mu, and 16 residential buildings have been developed

Project introduction:The plot area is 80, 000 square meters, with the transformer installed capacity for residential use of 4×500kVA+2×800kVA, and the installed capacity for public use of 2×630kVA. The transformer model applied to the project is SCB12 10/0. 4 Dyn11
Products  offered:The rectifier phase-shifting transformer